Arab High School Band Building
Birmingham, AL
Poole and Company worked with the Arab City
Schools to design and develop a new 7,500 SF Band
Building for Arab High School. The project included a
band rehearsal room, practice rooms, ensemble
room, administrative, and instrument, uniform, and
percussion storage areas. Acoustics were an integral
part of the design process to ensure quality sound
control, implemented by the size and proportions of
the band room as well as applied materials. Selection
of durable, maintainable materials was of primary
importance for a school setting, especially when considering life-cycle costs. |